新聞banner
Your current location : Home >> News >> Industry information

In order to ensure the normal operation of the booster cylinder, what should be paid attention to during use?

2019-10-21

    

    Because the booster cylinder is often in high-speed operation, it is easy to cause machine wear. Therefore, it should be operated according to the operation manual. The working temperature of the booster cylinder is about -5 °C~60 °C, and the operating speed is 50~1000mm/s. For the normal operation of the cylinder, the following points should be noted during use:

    

    1. Keep it clean

    

    Before connecting the gas-liquid booster cylinder to the gas path, please remove the dust and other debris in the pipeline and components first, so as not to reduce the service life of the booster cylinder.

    

    2. Use within normal pressure range

    

    When the cylinder is in normal use, the working air pressure must work within the working pressure range specified in the inspection report, and must not exceed the specified working pressure.

    

    3. Pay attention to the working environment of the booster cylinder

    

    The temperature of the cylinder in the working environment of the cylinder has been determined. If the working environment needs to be changed due to work, it is necessary to contact the relevant personnel of the booster cylinder technology.

    

    Since some of the components in the cylinder are made of iron, please do not use them in an environment with a complicated environment (such as a chemical contact environment). Also, install an effective air handling component at the front end of the cylinder ( Three-point combination) Lubrication and drainage treatment when connected.

    

    4. Do not tamper with other hydraulic oil

    

    The hydraulic oil selected for the booster cylinder is VG68# anti-wear hydraulic oil. It is irrevocably and self-changing to other liquid media (such as oil, water, etc.).

    

    5. Be sure to follow the program

    

    The action program must be operated according to the action program of the pneumatic circuit assembly diagram, that is, the pre-pressure action-supercharged action pressure release pressure-preload reset

    

    6. Pay attention to maintenance, often check the operation of the booster cylinder

    

    In order to avoid damage to your mold or workpiece caused by excessive pressure of the cylinder during pressurization, please install a pressure reducing valve at the inlet of the booster section to effectively protect your product.

    

    In order to ensure the stability of the working of the booster cylinder, it is recommended to install an air reservoir in parallel between the triplex and the booster cylinder as much as possible.

    

    When using a booster cylinder of more than 50000 times or more than half a year, it is recommended to replace all the hydraulic oil in the cylinder to improve the service life and working life of the cylinder.

    

    

Recently Viewed:

Tel: 13776173322 Fax: 53105101


Address: N0.88Kuntai Road(Tianggong Industrial Park)Taicang City Jiangsu P.R. China


Copyright ? SuZhou Simitch Machinery CO.,LTD Specializing in ,Welcome to inquire!
汽車零部件鉚接專機  汽車零部件鉚接專機

Mobile station

WeChat

Contact

TEL:0512-53105098

Message
{转码词1},{转码词2},{转码词3} 日本av女优江波作品正在播放| 先锋音影365| av天堂2019影音先锋| 强奸小说网址| 影音先锋撸AV| 性生活乱伦| 亚洲欧美图片| 亚州情色图AV| 影音资源 美女av| AV电影网站新影音先锋| 日本av女优电影| AV天堂网2016| 午夜之眼 无删减| 亚洲欧美影视| 先锋影音 电影| 鸥美成人电影| 电影天堂网AV| 亚洲成亚洲成| 真人牲交AV牲交aⅴ| 日本av电影官网| 换内内也拍在线免费观看|